PRJ-031 · Dredging & Reclamation
Nile River Dredging and Bank Protection
Channel clearance paired with durable riverbank protection
Royal Construction75% ongoing - started 2022
Dredging & Reclamation
Clearer flow. Stronger banks.
Dredging and clearance of a Nile River reach, formation of the riverbank profile, and installation of stone pitching or riprap protection to improve conveyance and protect vulnerable banks against erosion.
- Location
- Sohag, Sohag Governorate, Egypt (best estimate; exact Nile reach not publicly disclosed)
- Client
- Ministry of Water Resources and Irrigation (MWRI), Egypt
- Consultant
- Royal Construction - design/technical lead per source; no external consultant identified
- Value
- Confidential Information