PRJ-036 · Ports, Marinas & Marine Structures
Ashdod Marina - 500-Berth Piled Marina Development
Driven precast piles, underwater blasting, dredging and deck construction
In Cooperation with RoyalCompleted - 30 June 1998 (project period 1 June 1996-30 June 1998)
Ports, Marinas & Marine Structures
500-berth marina constructed on driven precast concrete piles
Completed underwater blasting; dredged approximately 150,000 m³ of sand; drove about 1,000 precast prestressed piles (35-50 cm); placed about 1,500 capping and deck elements; and installed 125 underwater anchor piles.
- Location
- Ashdod Marina, Ashdod, Israel
- Client
- The Blue Marina
- Consultant
- Owner-appointed marina engineer (not publicly identified; best estimate)
- Value
- Confidential Information